QGDW1875-2013变电站一体化监控系统测试及验收规范

 
QGDW1875-2013变电站一体化监控系统测试及验收规范

Q/GDW1875—2013

目次

前言········································································································································································Ⅱ1范围····································································································································································12规范性引用文件················································································································································13术语和定义························································································································································14缩略语································································································································································25仪器仪表基本要求与配置································································································································2

5.1仪器仪表要求··················································································································································2

5.2仪器仪表配置··················································································································································26测试及验收流程················································································································································37产品检测····························································································································································3

7.1概述································································································································································3

7.2单装置测试······················································································································································3

7.3系统测试·························································································································································48工厂验收····························································································································································7

8.1验收条件·························································································································································7

8.2验收项目·························································································································································7

8.3系统核查·························································································································································8

8.4系统功能验收··················································································································································89现场验收··························································································································································11

9.1现场调试项目················································································································································11

9.2现场验收·······················································································································································14附录A(规范性附录)性能指标测试··············································································································16编制说明································································································································································19

I


Q/GDW1875—2013

前言

为配合《智能变电站一体化监控系统建设技术规范》、《智能变电站一体化监控系统功能规范》的工程化实施,规范变电站一体化监控系统产品检测、工厂验收、现场验收等环节技术要求,按照2012年度国家电网公司技术标准制修订计划(国家电网科〔2012〕66号),国家电网公司组织编写了《变电站一体化监控系统测试及验收规范》。

本标准由国家电网公司国家电力调度控制中心提出并解释。

本标准由国家电网公司科技部归口。

本标准起草单位:中国电力科学研究院、国家电力调度控制中心、国网电力科学研究院、浙江电力公司、重庆电力公司、吉林电力公司、山东电力公司、江苏电力科学研究院、浙江电力科学研究院

本标准主要起草人:杨威、王化鹏、王永福、严冰融、李劲松、陆天健、施玉祥、许智、张小飞、赵蔚娟、叶海明、杨松、杜奇伟、尚力、张小易、阮黎翔

本标准首次发布。

II


Q/GDW1875—2013

bbs.99jianzhu.com内容:建筑图纸、PDF/word 流程,表格,案例,最新,施工方案、工程书籍、建筑论文、合同表格、标准规范、CAD图纸等内容。


TOP最近更新内容

    绿豆蛋花是怎样制作及具有什么样的功效?
    江苏省盱眙县都梁中学高中数学第2章平面向
  • 上一篇:火电机组SCR烟气脱硝氮氧化物控制系统
  • 下一篇:电力工程线路施工工程量统计