Introduction of Pressure Engineer Work
There are two main work of Pressure Engineer: Formation pressure forecasting and
monitoring.
Formation
pressure
the real time pressure of the drilling well. And base on the result of drilling reality, we must correct the forecasting data if necessary. All work for the purpose of service for drilling.
forecasting mainly use the data of seismic、wireline logging、mudlogging in same area to estimate the formation pressure、fracture pressure、overburden pressure of the new well. Find out normal compaction trend line.
Formation
pressure
monitoring
mainly use mudlogging data to calculate
Daily shift include daily pressure report, Overpressure summary, Hydraulics report , Formation Pressure Evaluate Plot & others request of client.
You can see the template of Daily Pressure report, Overpressure summary,
Hydraulics report & Formation Pressure Evaluate Plot.
Hydraulics report
Formation Pressure Evaluate Plot
Introduction of Pressure Engineer Work
CNLC MUD-LOGGING
bbs.99jianzhu.com内容:建筑图纸、PDF/word 流程,表格,案例,最新,施工方案、工程书籍、建筑论文、合同表格、标准规范、CAD图纸等内容。