摘要:工程预结算是基本建设工作的重要组成部分,既是确定工程造价、反映工料机消耗水平和考核施工图是否经济合理、办理拨款结算的重要依据,也是签订施工、材料订购合同的重要内容,因此做好这项工作是非常重要的。文章介绍提高建筑工程造价预结算审核质量的方法及在工程预结算审查时如何提高工程预结算审查质量,使之更加合理地确定工程造价。

关键词:工程预结算;审查;审核

Abstract: the settlement is the basic construction project of the important part, not only is sure engineering cost, reflect the consumption level and assessment work machine whether reasonable, deal with economic construction is an important basis for settlement, and construction, materials purchase contract signed the important content, so the job is very important. The article introduces the construction project cost increase the quality of the examining method and the settlement in engineering when reviewing how to improve the quality of engineering settlement review, and make it more reasonably sure project cost.

Keywords: engineering the settlement; Review; audit

0前言:

由于建设工程预结算的编制是一项很烦琐而又必须很细致地去对待的技术与经济相结合的核算工作,不仅要求编审人员要具有一定的专业技术知识,包括建筑设计、施工技术等一系列系统的建筑工程知识,而且还要有较高的预算业务素质。工程预结算审查人员,要做到公正、客观、实事求是地评价工程造价,不仅要以招投标文件、工程设计图纸、施工合同为依据,以现行的预算定额和相关文件为标准,还要不断地更新观念,拓宽自身的知识面,加深专业知识的深度和广度,在工作中找规律,提高综合管理能力和专业技能,找到解决问题的方法。通过对多个工程项目预结算的审查,笔者发现容易出现或被忽视的问题有:(1)预算定额标准滞后或与现实不符,个别分项工程子目内容不能囊括。(2)设计图纸漏项和变更的内容。(3)隐蔽工程,现场无法核对的内容。(4)特殊装饰项目人工、材料及机械消耗量确定。(5)土方外运。(6)材料的质量、价格的认价等。对于上述的问题审查人员采取了不同的方法予以解决,归纳起来有以下几个方面。

1做好每个项目内容的审查工作

工程预结算审查工作是一项很具体、细致的工作,每个环节或细节都与资金有着密切的关系,如果在某个细小部位出现马虎、粗心现象,就会造成不应有的损失。为了客观公正地反映工程造价,审查人员在工程预结算审查中抓大项目计算的同时,也不应放过细小项目的计算。某资料管理楼是一栋高31.9m、建筑面积为10450m2的综合楼,按照工程费用定额该工程取费类别属于三类工程,建设单位要求招标代理公司按四类工程计取工程费用编制公开招标文件,但送审的