9/29/2015

?An archipelago of more than 7,000 islands –Micro-grid solution as only option to small islands and islets ?Tropical climate –4-5 hour solar insolaiton available daily –Some areas with strong wind regime ?Past growing population and economy –Increasing demand for both urban and rural areas ?Government commitment towards inclusive growth, poverty alleviation and environmental sustainability –Total electrification goal –Renewable energy goal –Subsidy mechanisms when necessary ?Private sector-driven economy –Investors (domestic and international) are invited to do business 3 3


New Power

GENCOs/IPPs Providers (NPPs)

(Grid) (Small Islands)

Distribution

Utilities (PIOUs, Electric Coops,

etc.)

Qualified Third Parties & CSOs (Mini-/Micro-grid) 4


?State owned NAPOCOR privatized

?Generation open to all GENCOs

?Wholesale Electricity Spot Market (WESM)

established as default buyer

Competitive Generation Sector Regulated Transmission &Distribution

?One Transmission Operator (TRANSCO/NGCP)

–Open Access Policy

–Regulated transmission wheeling rate

?More than Franchised 140 Distribution Utilities

–5 Major Private-Investor Owned Utilities (PIOUs)

–119 Electric Cooperatives

–Open Access Policy

Retail Competition End-Users ? Contestable

? Captive ?Retail Competition and Open Access (RCOA)

–Separates distribution from supply business

–Contestable Market (750kW above) open for Retail Electricity Suppliers (RECs) 5


Note: Transparent

islands in

the above diagram are not covered by the 3 main grids


2014

1st Half 2015*

Hydro 9.2%

Geothermal 13.8%

Wind LFG Solar Biomass 0.7%

0.0% 0.1% 0.3%

Coal 45.6%

Natural Gas 23.8%

Oil-based 6.5%

LFG

RE Share = ~25.6 %

Self Sufficiency

= 53 %

RE Share

= ~ 23.8 %

* Preliminary data Source: Submitted

Monthly Operations Report (MOR) of GenCos

NGCP Daily Operations Report (DOR)


Installed and Dependable Capacity (in MW)

150 MW EDC Wind Farm (Ilocos Norte) 22 MW SACASOL Solar Farm (Negros Occ.) 7 MW HEDCOR Tudaya 2 HEPP (Davao del Sur) 8



?Strong Government RE Policies and Program

?Committed Electrification Program

?Support for Sustainable Development

?Private Sector Participation

?Efficient and Reliable Technologies

9/29/2015

?Implementation of Renewable Energy Act –Feed-in Tariff System (Solar, Wind, Mini-Hydro, Biomass, etc.) –Fiscal and Non-Fiscal Incentives –Renewable Portfolio Standard w/ Tradable RE Certificates ?Rules of Entry and Operation by Private Sector (Policy/Regulatory Frameworks) –New Power Providers of NPC-SPUG in Small Island and Isolated Grid –Qualified Third Parties + Distribution) in areas waived by Distribution Utilities as Service Provider (Generation ?Total Electrification Program –90% Household Electrification by 2017 –2018 and beyond: total electrification of all areas using micro-grids, solar home systems, and others ?Technology Cooperation –Technical Standards and Certification

–Cost Monitoring 10


9/29/2015

11


NREP 2011-2030 Targets

12


HOUSEHOLD ELECTRIFICATION

DEVELOPMENT PLAN

Towards 90% Household Electrification by 2017

?Grid Off-Grid

Electrification Electrification Regular NEA SEP & DOE-REMB Connections BLEP PV HEP MAINSTREAMING DOE-EPIMB Mini-Grid and ER 1-94 NIHE Project QTP approach Other RE-Based

Electrification

13 13


?Existing and On-going Qualified Third Party Projects

?Private Recently approved EU-assisted Access to Sustainable Energy Programme will pursue Call for Proposal for Innovative Micro-Grid Projects to serve +20,000 HHs (~1.5MW)


?

Utility-based/fee-for-service approach for Solar home System electrification of

dispersed households in remote areas; Piloted in the six (6) Electric Cooperatives ?On-going Program: EU-assisted Access to Sustainable Energy Programme scaling up

to at least 100,000 HHs (~6MWp Capacity)

15


?Approaches in addressing barriers to development of RE market and Micro-Grid


The 6th International Energy Storage and Micro Grid

Summit

Yantai, China

September 22-24, 2015

Contact Persons at the DOE Electric Power Industry Management Bureau Philippines:

17

bbs.99jianzhu.com内容:建筑图纸、PDF/word 流程,表格,案例,最新,施工方案、工程书籍、建筑论文、合同表格、标准规范、CAD图纸等内容。


TOP最近更新内容

    绿豆蛋花是怎样制作及具有什么样的功效?
    江苏省盱眙县都梁中学高中数学第2章平面向
  • 上一篇:2016上海印刷包装展(2016上海印刷周,2016上海印刷
  • 下一篇:1510维修措施