谈工程现场签证管理存在的问题及对策

 
谈工程现场签证管理存在的问题及对策

谈工程现场签证管理存在的问题及对策

摘要:随着我国经济的发展,法制建设也在不断进步,工程事业作为当前我国城市化建设的重点内容,不断完善工程的施工建设,保证工程施工的政策运行,对于当今社会进步,经济发展有重要意义。而在施工过程中,承、包双方在工程施工的资金费用、工期长度及施工具体活动等特殊情况达成的协议,都要通过现场签证的形式进行,是整个工程施工索赔的依据,具有十分鲜明的协议契约特点,是工程施工过程中控制造价、对工作进行管理的重要环节,不仅影响这整个工程的成本,而且对施工的进程和整体效益都有重要作用。本文通过对工程现场签证管理中存在的问题进行探析,从而提出相应的处理对策。

关键词:工程施工;项目施工;现场签证;签证管理

Abstract: with the development of our national economy, legal system construction are improving, works for the current urbanization construction the key content, and constantly improve the construction of construction of the project, ensure project construction operation policy to the social progress and economic development to have the important meaning. And in construction process, tester, both sides in the bag construction and engineering cost money, time limit the length and construction concrete activities special cases of the agreement, all through the field in the form of visa, the whole project is the basis of the construction claims, have very distinct agreement contract characteristic, is the construction process in control of cost, to work the important part of the management, not only affects the whole project cost, and the process of the construction and the overall benefit has an important role. This article through to the construction site visa the problems existing in the management and analysis, and put forward the corresponding countermeasures.

Keywords: engineering construction; Project construction; The visa; Visa management

随着近年来经济体制的改革不断深入,现场签证作为工程施工中双方对施工具体工作达成的协议及施工保证,是在施工现场由业主的代表、施工单位负责人及监理共同签署,用来保证施工活动中一些特殊情况的书面协议。一方面在工程施工中,设计图纸之外和项目预算没有包括的施工内容,却在实际施工中发生了,例如施工过程中地下重物的拆除和恢复,及一些其他人力不可抗拒的工程损害,对施工的资金投入、施工时间及施工损失等变化。另一方面,就是在具体的工程项目施工中,承包合同上的中标价由于签证变更及有关合同规定上允许调整的费用,规划具体的索赔规定。其具有鲜明的契约性质,是加强工程施工管理,控制


bbs.99jianzhu.com内容:建筑图纸、PDF/word 流程,表格,案例,最新,施工方案、工程书籍、建筑论文、合同表格、标准规范、CAD图纸等内容。


TOP最近更新内容

    江苏省盱眙县都梁中学高中数学第2章平面向
    绿豆蛋花是怎样制作及具有什么样的功效?
  • 上一篇:谈工程质量事前控制的重要性
  • 下一篇:谈高层建筑施工中沉降观测技术